Skip to content

Alabama renewal guide

Manufactured Home Installer License

If this license is up for renewal, this page gives you the fee, the timeline, and the items that usually hold the filing up.

Start here

What matters before you file.

Check the fee, the renewal window, and the documents or insurance records that can slow approval down.

Renewal period

Every 12 months

Renewal fee

$200.00

Late penalty

$100.00

Bond requirement

Yes — $20,000.00

Insurance requirement

Yes — General Liability, Workers' Compensation

Before you renew

Get the filing straight.

  1. 1

    Make sure the bond still clears

    The $20,000.00 bond requirement needs to stay active through the renewal.

  2. 2

    Check the insurance certificates

    Make sure the required policies are current and match what the board or agency expects before you file.

  3. 3

    File with the board

    File through Alabama Manufactured Housing Commission and pay the $200.00 renewal fee once the supporting proof is ready.

    Renew online
  4. 4

    Leave room for processing

    Typical processing time is 21 days, so do not wait until the last minute.

If you miss the deadline, the late penalty is $100.00.

Detailed notes

The fine print is here.

Alabama Manufactured Home Installer Certification


The Alabama Manufactured Housing Commission (AMHC) certifies installers of manufactured homes and manufactured buildings statewide. Certification is required for any person performing manufactured home installation.


Requirements


  • Training: Must complete AMHC installer course and pass written or oral test
  • Insurance: General liability ($100,000 minimum) and workers' compensation required
  • Bond: $20,000 surety bond required
  • Application Fee: $200

Continuing Education


  • Refresher Course: Required every 2 years after initial certification
  • Provider: Courses conducted by the AMHC at locations throughout the state
  • Failure to complete: May result in certification revocation

Renewal Information


  • Renewal Period: Annual
  • Renewal Fee: $200
  • Late Payment Fee: 50% of certification fee ($100)

Bond Requirement


A $20,000 surety bond is required to protect consumers against defective installation work.


Additional Fees


  • Installer Decal: $130
  • Certificate of Training: $200

Federal Requirements


Manufactured home installers must comply with HUD's federal installation standards in addition to Alabama state requirements. The AMHC enforces both federal and state standards.


Scope of Work


Covers installation, setup, anchoring, and blocking of manufactured homes. A certified installer or employee with a current certificate of training must be present during the entire installation process.


*Disclaimer: This information is provided for general reference only and does not constitute legal advice. Always verify current requirements directly with the Alabama Manufactured Housing Commission.*

Official links

Check the board or agency directly.

Required documents

  • Proof of Insurance
  • Examination Results
  • Experience Documentation
  • government_issued_id

Rules move. Check Alabama Manufactured Housing Commission again before you pay, renew, or schedule work around this requirement.

Track the next renewal.

Keep Manufactured Home Installer License dates, proof, and official links with the rest of your license work.

Free to start. No credit card required.