New Mexico renewal guide
Mechanical Contractor — Plumbing, HVAC and Gas (MM-98)
If this license is up for renewal, this page gives you the fee, the timeline, and the items that usually hold the filing up.
See this alongside the other 5 New Mexico license pages we track.
Start here
What matters before you file.
Check the fee, the renewal window, and the documents or insurance records that can slow approval down.
Issuing authority
Renewal period
Every 36 months
Renewal fee
$300.00
Bond requirement
Yes — $10,000.00
Insurance requirement
Yes — Workers' Compensation
Last verified
Oct 2026
Before you renew
Get the filing straight.
- 1
Make sure the bond still clears
The $10,000.00 bond requirement needs to stay active through the renewal.
- 2
Check the insurance certificates
Make sure the required policies are current and match what the board or agency expects before you file.
- 3
File with the board
File through New Mexico Regulation and Licensing Department — Construction Industries Division (CID) and pay the $300.00 renewal fee once the supporting proof is ready.
Renew online - 4
Leave room for processing
Typical processing time is 30 days, so do not wait until the last minute.
Detailed notes
The fine print is here.
New Mexico Mechanical Contractor License (MM-98)
The New Mexico Construction Industries Division (CID) issues the MM-98 Mechanical Contractor license, the comprehensive mechanical classification covering plumbing, HVAC, and gas fitting work in both residential and commercial settings.
What This License Authorizes
MM-98 licensees may perform all mechanical trade work including plumbing installation and repair, HVAC system installation and service, natural gas fitting, and related mechanical construction work. This classification encompasses all work authorized under the individual mechanical sub-classifications (MM-1 Plumbing, MM-2 Gas Fitting, MM-3 HVAC).
Experience and Examination Requirements
Applicants must designate a Qualifying Party (QP) who has a minimum of 4 years (8,000 hours) of foreman-level practical or related trade experience within the 10 years preceding the application. The QP must pass both a trade-specific examination and a Business and Law examination administered by PSI.
Bond and Insurance Requirements
- Surety Bond: $10,000 contractor license bond required
- Workers' Compensation Insurance: Required for all licensed entities
- General Liability Insurance: Not required by the state, but recommended
Fees
- Application Fee: $30 (non-refundable)
- License Fee: $300 for 3 years ($100 per year)
- Exam Fee: $36 per exam (paid to PSI)
Renewal Process
- Renewal Period: Every 3 years
- Renewal Fee: $300 ($100 per year)
- Late Renewal: A license not renewed on time is suspended and subject to cancellation (14.6.3.8(I) NMAC; NMSA 60-13-18); CID sets any late charge, so confirm the amount before your expiration date
- No Continuing Education Required for the contractor license itself. However, individual journeyman plumbers and mechanical workers under this license must complete 16 hours of continuing education per 3-year renewal cycle.
Consequences of Operating Without a License
Operating without a valid CID license is a misdemeanor under NMSA 60-13-52. Penalties range from $300 to $500 for work under $5,000, up to 10% of the contract value for larger projects, plus possible jail time.
*Disclaimer: This information is provided for general reference only and does not constitute legal advice. Always verify current requirements directly with the New Mexico Construction Industries Division.*
Official links
Check the board or agency directly.
Required documents
- Bond Certificate
- Proof of Insurance
- experience_verification
Source notes
New Mexico RLD Construction Industries Division, 14.5.5 NMAC . Verified March 2026. https://www.rld.nm.gov/construction-industries/ Application fee: NMAC 14.5.5.8 sets $30; the agency apply page's $36 is that $30 plus a $6 certificate fee (PSI fee schedule). License fees per the PSI fee schedule (CID's licensing vendor); the PSI fee schedule sets late renewal at $1 per day for 1-30 days late and one year's fee for 30-90 days late; past 90 days the license is cancelled. NMAC itself states neither.
Rules move. Check New Mexico Regulation and Licensing Department — Construction Industries Division (CID) again before you pay, renew, or schedule work around this requirement.
Related content
Keep exploring.
Other New Mexico licenses
- General Building Contractor (GB-98)
- Electrical Contractor — Residential and Commercial (EE-98)
- Building Specialty — Plastering, Stucco and Lathing (GS-30)
- Building Specialty — Concrete, Cement, Walkways and Driveways (GS-4)
- Building Specialty — Framing (GS-13)
Manage the next renewal.
Keep Mechanical Contractor — Plumbing, HVAC and Gas (MM-98) dates, proof, and official links with the rest of your license work.